180! (nearly)
Building Inspector came round this morning and apart from wanting a 50mm air gap between the front roof and the insulation, he's happy with everything. Even better, he signed it all off saying he trusted us to get the gap put in. Builder busy adding extra batons to drop insulation down and make requisite space as we speak/type/blog. Next stop plasterboarding and tomorrow, we should get the radiators in, the electrics wired up and the new fuse box in.
0 Comments:
Post a Comment
<< Home